# Request for Quotation — ultrasonic humidifier, reference-based

**RFQ reference:** RFQ-REF-001
**Status:** DRAFT — DEMONSTRATION ONLY. Not issued, not sent, not binding.
**Issue date:** Not issued. This document is an unreleased draft.
**Response deadline:** To be set by the buyer (see §9). No deadline is stated.
**Buyer:** Demonstration buyer. No legal entity, address or contact is supplied in this demonstration.
**Companion files:** `product-specification.csv` (specification record), `specification-note.html` (short note on the reference values), `RFQ-response.csv` (response template).

---

## 1. Status of this document — read first

This is a **team demonstration** built on the public listing of a reference product. It is:

- **not a purchase order**, not an invitation to contract, and not a commitment to buy anything;
- **not a manufacturing drawing** and not a released engineering specification;
- **not based on a sample** — no physical unit, golden sample or measurement has been exchanged;
- **not sourced from any supplier** — no supplier has been contacted, no quotation has been received, and no reply of any kind is reproduced here.

Every product figure below is a **reference value** taken from one public product page, checked 27 November 2026. Reference values are **not approved requirements**. Where the buyer has not supplied information, the field is left blank and marked as needing confirmation rather than filled with an assumption.

---

## 2. Purpose

To obtain, in one comparable format, the information a buyer needs before a humidifier specification can be finalised:

1. **Price tiers** at several order quantities;
2. **MOQ** by configuration;
3. **Sample cost** and sample terms;
4. **Lead times** for samples and for production;
5. **Shipping basis** (the Incoterm and named place the supplier can offer);
6. **Certification evidence** for the destination market;
7. **Deviations** — a written list of every point where the supplier's product would differ from the proposed specification in §4.

Suppliers are asked to answer against the specification **as proposed**, and to state clearly where they would deviate, rather than adjusting their offer silently to match.

---

## 3. Reference product (public reference only)

| Item | Detail |
|---|---|
| Reference product | Levoit Classic 160 humidifier |
| Source | Public brand product page: <https://levoit.com/products/classic-160-humidifier?variant=43309280067735> |
| Source checked | 27 November 2026 |
| Nature of source | Manufacturer-stated listing data — read, not independently tested |

The reference product is used **only** to give suppliers a concrete form factor and performance band to respond to. It does not imply that the buyer will order this product, that any supplier's existing model is acceptable, or that the reference brand's values have been verified.

---

## 4. Proposed technical baseline

The values below are the **public reference figures**, converted where needed and shown with their status. Suppliers should treat them as the proposed baseline for the purposes of this RFQ and respond with their capability and deviations.

| Ref | Parameter | Proposed baseline value | Status of value |
|---|---|---|---|
| S-04 | Product type | Ultrasonic humidifier, cold mist | Reference only |
| S-05 | Water tank capacity | 2.5 L | Reference only — tolerance not stated |
| S-06 | Rated voltage | 120 V AC | Reference only — destination not yet fixed |
| S-07 | Rated frequency | *Blank — to be confirmed* | Not supplied |
| S-08 | Mist technology | Ultrasonic, cold mist | Reference only |
| S-09 | Mist output, low | 100 ml/h ±20% at indoor 21 °C | Reference only (tolerance is the manufacturer's) |
| S-11 | Mist output, high | 190 ml/h ±20% at indoor 21 °C | Reference only (tolerance is the manufacturer's) |
| S-13 | Runtime, low | Up to 25 h | Reference only |
| S-14 | Runtime, high | Up to 11 h | Reference only — see §5, item 1 |
| S-16 | Control | Infinity (stepless) knob | Reference only |
| S-17 | Overall depth | 6.38 in / 162.1 mm | Reference only — no tolerance stated |
| S-18 | Overall width | 7.12 in / 180.8 mm | Reference only — no tolerance stated |
| S-19 | Overall height | 10.14 in / 257.6 mm | Reference only — no tolerance stated |
| S-20 | Product weight | 2.16 lb / 979.8 g | Reference only — dry or filled state not stated |

Full record with sources, statuses and the evidence required for each field: `product-specification.csv`.

### 4.1 Fields the buyer has deliberately left open

The following are **not requirements in this draft** and must not be assumed by suppliers. They are marked `BLANK - needs confirmation` in the specification record:

materials and material grades (housing, tank, seals) · dimensional tolerances · noise level · power consumption · rated frequency · safety features (waterless cut-off, overheat protection) · filter type · performance or coverage claims · warranty terms · standards and certification · retail packaging · master carton · shipping marks and barcodes · MOQ · buyer quantity · destination market · currency · Incoterm · target price · tooling ownership · RFQ deadline · required delivery date · sample terms.

Suppliers may propose values for any of these, clearly labelled as **supplier proposals**, and those proposals will be recorded as such.

---

## 5. Open technical questions for suppliers

These are the points the public source does not resolve. An answer with a test method is more useful than a claim.

1. **Runtime reconciliation.** 2.5 L at 190 ml/h implies 13.16 h, but the reference states up to 11 h — a gap of 2.16 h, equal to roughly 2.09 L (83.6% of nominal tank) actually used at the high setting. What usable water volume does your unit draw at low and at high, and what stops it (float, probe, timer)?
2. **Output test conditions.** At what ambient temperature and relative humidity, at what distance, and over what run length do you measure 100 and 190 ml/h — and can you supply the raw test record?
3. **Tolerance and sampling.** What output tolerance can you guarantee at each setting, and on what sample size and acceptance number?
4. **Noise.** What is the sound level at 1 m on low and high?
5. **Power.** Rated and measured input power at each setting; transducer count and rated life.
6. **Materials.** Housing, tank, seal and gasket materials with grades, and any food-contact or BPA statement the destination market will require.
7. **Tolerances.** Your general tolerance block for the three overall dimensions, and the measurement method used for inspection.
8. **Safety.** How is dry-run and overheat protection implemented, and how is it tested?
9. **Certification.** Which standards and marks does the product already carry, and for which countries? Name the test laboratory and report numbers.
10. **Packaging.** Retail carton board grade, master carton configuration and units per carton, gross weight, drop-test standard and report reference.

---

## 6. Information required in the response

Every supplier should answer all seven blocks. Where an item cannot be answered, write `not quoted` — a blank cell will be treated as no answer, not as agreement.

### 6.1 Price tiers

- Unit price at each of at least **three quantity tiers**, quoting the tier quantity explicitly (for example, one tier at your MOQ, one at a mid volume, one at an annual volume).
- State the **ex-works or FOB-equivalent** basis of your price and itemise anything not included (tooling, certification, artwork, packaging upgrade, freight, duties).
- State the **currency**, the **price validity period**, and how long the price holds after order confirmation.
- Note any price break driven by packaging or configuration rather than volume.

### 6.2 MOQ

- MOQ **per model and per configuration** (colour, plug, voltage, packaging language).
- MOQ for a **trial or pilot order**, if different from production MOQ.
- Whether MOQ changes when a tooling or artwork investment is made.

### 6.3 Sample cost and sample terms

- Cost per sample unit, and courier cost and basis.
- Sample lead time after sample order and after artwork or specification approval.
- Whether samples are **stock units or built to specification**.
- Whether the sample cost is credited against the first production order, and under what condition.

### 6.4 Lead times

- Sample lead time (days, from what starting event).
- Production lead time (days, from deposit and from artwork or specification approval — state which).
- Capacity per month at the quoted configuration, and the constraint (line, mould, labour, component).
- Lead time for a repeat order, and any seasonality or holiday shutdowns that affect it.

### 6.5 Shipping basis

- The **Incoterm(s) you can offer** and the **named place** for each (the buyer has not fixed one).
- Port or airport of departure; whether you handle export documentation.
- Packed volume per unit, units per master carton, gross weight, and container loadability.
- Any shipping restriction that applies to the product (for example batteries or liquids, if relevant).

### 6.6 Certification evidence

- Copies of current test reports and certificates, with **issuing laboratory, report number and date**.
- The **exact standard editions** tested against, and the country or region each covers.
- Whether the certificate is held in the supplier's own name or a third party's, and whether the product as configured for this RFQ is covered.
- Which certifications are **already held** and which would need to be commissioned, with cost and lead time for each.

### 6.7 Deviations against the proposed specification

For **every** line in §4 and every open field in §4.1, state one of: *meets*, *exceeds*, *deviates*, or *cannot meet* — with the supplier's own value and the reason. Send the deviation list as a written annex even when there are no deviations (then state "no deviations"). A deviation disclosed in the response will not disqualify a supplier; a deviation discovered later will.

---

## 7. Response format

Complete `RFQ-response.csv`. One row per item, no restructuring of the columns:

| Column | What the supplier puts there |
|---|---|
| `block` | The response block the row belongs to (§6.1–§6.7) |
| `ref_id` | The specification reference (S-xx) or the RFQ item ID |
| `item` | What is being answered |
| `reference_value_or_requirement` | Pre-filled from the specification record — do not edit |
| `unit` | Unit of the supplier's answer |
| `supplier_response` | The supplier's value, statement or `not quoted` |
| `deviation_yn` | `Y`, `N` or `unknown` |
| `evidence_reference` | Document name or number supporting the answer |
| `supplier_comments` | Test conditions, assumptions, alternatives, caveats |

Every `supplier_response` cell in the supplied template is empty on purpose. The file contains **no supplier answers**, because no supplier has been contacted.

If a document cannot be attached, name it and state when it can be supplied. Do not summarise a test report in a cell — reference it and attach it.

---

## 8. What the supplier should not assume

- That the reference values in §4 are fixed requirements, or that the reference brand's product will be ordered.
- That the destination market, voltage, plug type, packaging language or certification scope are settled — they are not.
- That any price, MOQ or lead time has been pre-agreed, or that a target price exists. **No target price is set in this RFQ.**
- That tooling ownership, amortisation or transfer terms have been decided — state your standard position.
- That an incomplete response is comparable with a complete one. Unanswered blocks reduce the usefulness of the quotation.

---

## 9. Buyer inputs still required before this RFQ can be issued

These are buyer decisions, not supplier questions. They are listed so the draft is not mistaken for a releasable document:

| Input | Why it matters |
|---|---|
| Destination market | Sets voltage, plug, certification scope and language |
| Currency and Incoterm with named place | Makes prices comparable at all |
| Buyer quantities: trial, first order, annual | Drives tier structure and MOQ negotiation |
| Target price (optional) | Not disclosed — decide whether to disclose one |
| RFQ response deadline and required quote validity | Currently unset |
| Required delivery date or window | Currently unset |
| Tooling ownership and transfer position | Currently unset |
| Approved requirements and tolerances | Reference values are not yet requirements |
| Evaluation weights and scoring method | Not yet defined |

---

## 10. Evaluation approach

Responses will be compared on: completeness of the seven blocks; price at a stated tier with a stated shipping basis; MOQ and sample terms; lead time credibility; quality of certification evidence; and the size and transparency of the deviation list. No weights or scoring scale are set in this draft — they are a buyer decision to be made before any response is opened. A low price with unexplained deviations is not a better offer than a higher price with a fully disclosed one.

---

## 11. Attachments

1. `product-specification.csv` — specification record: field, value, unit, source, status, acceptance evidence needed.
2. `specification-note.html` — short note on the reference values, the tolerance band and the runtime discrepancy.
3. `RFQ-response.csv` — response template, to be completed by the supplier.

---

## 12. Demonstration notice

Prepared as a team demonstration from a public product listing. No supplier was contacted, no quotation requested, and no reply is represented anywhere in these files. No price, MOQ, lead time, certification, material or tolerance has been sourced. Blank means **not supplied**, never zero. Any organisation wishing to use this draft commercially must first make the buyer decisions in §9 and re-issue it as its own document.
